Construction period: July 2021 – July 2023
Cost: 6 599 523,34 € + vat
Reconstruction of State Road 59 Pärnu - Tori km 16.8 – 21.05 and demolition of the Tori bridge and construction of a new bridge.
The bridge was designed by Aivar-Oskar Saar from the engineering firm OÜ Järelpinge, built by TREF Nord AS, and supervised by AS Teede Tehnokeskus. The architectural solution was created by Mari-Liis Vunder and Rain Robert Randväli from Arpana Arhitects.
Key points: