Construction period: October 2023 – September 2025
Cost: 14 017 688,61 € +vat
Key points:
Construction of the 2+2 road section of the national road no. 4 Tallinn – Pärnu – Ikla km 122.6 – 125.2 Sauga – Pärnu.
Construction of a new entrance to Pärnu between Sauga and Pärnu.
The builder was TREF Nord AS, and the owner supervision was carried out by Sweco Eesti OÜ.