Tori Bridge

Location:
Pärnumaa, Tori vald
Year:
2023
Customer:
Transpordiamet

Description

Construction period: July 2021 –  July 2023 

Cost: 6 599 523,34 € + vat

Reconstruction of State Road 59 Pärnu - Tori km 16.8 – 21.05 and demolition of the Tori bridge and construction of a new bridge.

The bridge was designed by Aivar-Oskar Saar from the engineering firm OÜ Järelpinge, built by TREF Nord AS, and supervised by AS Teede Tehnokeskus. The architectural solution was created by Mari-Liis Vunder and Rain Robert Randväli from Arpana Arhitects.

Key points: 

  • Asphalt concrete top layer installed: 34,287 m² 
  • Built embankment: 7000 m3

    And has ensured the basic readiness of the Tori Bridge by the time of issuing this confirmation letter: 

  • Length of bridge constructed during the works: 140.6 m 
  • Bridge spans: 33.0 + 48.0 + 33.0 m 
  • Bridge height at normal water level: 9.8 m 